Our client reported the drainage channel along the entrance to the loading areas of the industrial units was breaking up, making it difficult for fork-lift trucks to operate safely.

Working closely with tenants to ensure a safe passage into their parking areas whilst enabling works to proceed swiftly, a safe system of work was introduced and alongside suitable traffic management, works commenced.

25mtr sections of the old drainage channel were excavated and removed, and a new sub-base laid ready for the new channels. The new channels were set into a concrete base and the top surface finished in tarmacadam.

The complete project took two weeks to complete.