IPM Facilities was appointed to deliver both hard and soft landscaping, alongside internal flooring works, at The Folgate Building, a high-profile commercial development in London.
Our work helped shape the look, feel, and functionality of the building, creating high-quality internal and external spaces that support both tenant experience and long-term environmental performance. Designed to achieve a BREEAM Outstanding rating and with EPC Class A certification, The Folgate Building reflects a clear commitment to sustainability, usability, and modern workplace design.
IPM’s landscape delivery played a central role in bringing this vision to life, shaping external spaces that support both environmental performance and occupier experience.
The brief
This project needed a landscaping scheme that would do more than enhance appearance. The external spaces needed to feel purposeful, attractive, and easy to use, while complementing the building’s contemporary architecture and wider urban setting.
At the same time, the works needed to support the development’s environmental ambitions and deliver a consistent standard of quality, despite challenging access, location constraints, and the complexities of working at height. Key requirements included:
Project challenges
Delivering landscaping at height across multiple terraces and rooftop spaces introduced significant logistical complexity.
A key challenge was the safe and efficient movement of materials to elevated areas across the building. With limited access points and tight urban constraints, all materials required careful lifting and placement via crane. Through careful planning and coordination, IPM ensured materials were delivered exactly where needed, allowing works to progress smoothly and in line with programme.
The presence of critical underground infrastructure, including UKPN cables supplying power across London, required careful planning and execution throughout the groundworks.
Our solution
IPM adopted a carefully planned and coordinated approach to manage the complexity of working across multiple levels within a constrained urban environment.
Early-stage planning and collaboration with the wider project team ensured that logistics, access, and sequencing were fully considered, particularly in relation to crane operations and material movement across the building.
Groundworks and infrastructure were to be delivered with a controlled and methodical approach, allowing works to be carried out safely around critical UKPN services while integrating complex drainage systems to support long-term performance.
Planting strategies were developed specifically for rooftop and terrace conditions, with a focus on resilience, biodiversity, and long-term sustainability.
This coordinated approach ensured that each phase of the project was delivered efficiently, maintaining programme, quality, and design intent throughout.
The result
The Folgate Building is more than just a workplace. It is a modern urban environment designed to perform well for both people and the planet.
Despite the complexity of logistics, infrastructure, and multi-level coordination, the project was delivered over an 18 to 24 month programme and completed on schedule in October 2024.
IPM is proud to have contributed to a project where landscaping plays a central role in defining the building’s character, supporting sustainability goals, and creating spaces people genuinely want to use.
Whether you are reviewing suppliers for an upcoming tender or exploring options for your site, we would welcome the opportunity to discuss your requirements.